Powering the future, one Joule at a time

Introducing the Joule BetterGrid:
Behind-the-Meter Power. Under Construction in Utah.

The Joule BetterGrid generates its own power behind the meter — completely independent of grid constraints. Infrastructure reimagined for AI scale.

A Gigawatt-Class Campus Rising.

A 1+ GW Phase 1 campus in Millard County, Utah — entitled, equipped, and under construction. Our unified data center campus will feature shared cooling districts, and redundant power.

4,000 acres owned

1+ GW equipment on firm order. Construction underway.

Our Progress Report.

Every milestone below represents millions invested, contracts executed, and deadlines already met—not future promises or conditional commitments. When others talk about "securing sites" we show deeds; when they mention "power planning" we show Caterpillar purchase orders; when they project timelines, we pour foundations. This is the difference between developing infrastructure and having developed it.

Our Progress Report

Each milestone below is executed — deeds recorded, permits approved, purchase orders signed, ground broken.

Image
Image
ImageImageImageImageImage

Land

  • Fee Simple Land Owned by Joule
  • 4,000 contiguous acres
  • Conditional Use Permits secured to begin construction
    • Millard County, Utah
    Construction equipment on site
    Image
    ImageImageImageImageImage

    Construction

    • Ground broken November 2025
    • Site mobilized
    Image
    Image
    ImageImageImageImageImage

    Power

    • Behind-the-Meter natural gas reciprocating engines
    • 1+ GW generation equipment on firm order, in production.

    • Made in the USA
    Image
    Image
    ImageImageImageImageImage

    Fuel Supply

    • Kern River mainline interconnect
    • Reliable natural gas at scale
    • Dedicated pipeline interconnect with Kern River Gas Transmission.

    Image
    Image
    ImageImageImageImageImage
    Permits
    • Entire site zoned Heavy Industrial
    • Conditional Use Permit approved for data centers and on-site generation

      Joule BetterGrid: Purpose-built for AI's Future

      Designed for high-density AI workloads with direct-to-rack power and liquid cooling infrastructure built in from day one.

      Image

      4,000 acres owned, located in Millard County, Utah. Over 4,800 feet above sea level provides optimal cooling efficiency.

      Image

      Buildings Phase I : 6 facilities

      Image
      Image

      4,000 acres owned, located in Millard County, Utah. Over 4,800 feet above sea level provides optimal cooling efficiency.

      Image
      Buildings Phase I: 6 facilities
      Image

      Power Density: Up to 800kW per rack

      Step Into a Pre-Engineered Data Campus and Accelerate Time-to-Compute

      • Shovel ready, entitled.
      • Architectures tuned for high-density racks and liquid cooling.

      • Use our design or bring your own – either way, the campus is ready.

      From Concept to Gigawatts:
      The Team That Delivers

      Meet the Joule team and discover what drives their mission to build one the world’s largest energy and advanced computing campuses.

      From Concept to Gigawatts: The Team That Delivers

      Meet the Joule team and discover what drives their mission to build one the world’s largest energy and advanced computing campuses.

      Image
      Image
      Image
      Image
      Image
      Image
      Image
      Image
      Image
      Image
      Image
      Image
      Image
      Image

      Built for AI Workloads

      Purpose-built infrastructure turns every watt into competitive advantage.