Powering the future, one Joule at a time

Introducing the Joule BetterGrid:
Powering Tomorrow’s AI Revolution

The Joule BetterGrid generates its own power behind the meter — completely independent of grid constraints. Infrastructure reimagined for AI scale.

A Gigawatt-Class Campus Rising.

1+ GW Phase I with future phases utilizing diverse energy sources.

On 4,000 acres of Utah high desert—where altitude delivers better cooling efficiency and six fiber routes converge—we're building the infrastructure backbone for AI's next decade. Our unified data center campus will feature shared cooling districts, and redundant power.

2027: 1.4 GW 

End of 2029: 1+ GW

Our Progress Report.

Every milestone below represents millions invested, contracts executed, and deadlines already met—not future promises or conditional commitments. When others talk about "securing sites" we show deeds; when they mention "power planning" we show Caterpillar purchase orders; when they project timelines, we pour foundations. This is the difference between developing infrastructure and having developed it.

Our Progress Report

Every milestone below represents millions invested, contracts executed, and deadlines already met—not future promises or conditional commitments. When others talk about "securing sites" we show deeds; when they mention "power planning" we show Caterpillar purchase orders; when they project timelines, we pour foundations. This is the difference between developing infrastructure and having developed it.

Image
Image
ImageImageImageImageImage
Land
  • Fee Simple Land Owned by Joule
  • 4,000 contiguous acres
  • Conditional Use Permits secured to begin construction
    • Millard County, Utah
    Image
    Image
    ImageImageImageImageImage
    Water
    • Water secured
    • 3.2 billion gallons per year
    • No burden on community resources

    Image
    Image
    ImageImageImageImageImage

    Power

    • Behind-the-Meter natural gas reciprocating engines
    • 1+ GW generation equipment on firm order, in production.

    • Made in the USA
    • First delivery mid-2027
    Image
    Image
    ImageImageImageImageImage

    Fuel Supply

    • Kern River mainline interconnect
    • Reliable natural gas at scale
    • Dedicated pipeline interconnect with Kern River Gas Transmission.

    Image
    Image
    ImageImageImageImageImage
    Permits
    • Entire site zoned Heavy Industrial
    • Conditional Use Permit for Data Centers and Electrical Generation Facilities including SMR

      Joule BetterGrid: Purpose-built for AI's Future

      Designed for high-density AI workloads with direct-to-rack power and liquid cooling infrastructure built in from day one.

      Image

      4,000 acres owned, located in Millard County, Utah. Over 4,800 feet above sea level provides optimal cooling efficiency.

      Image

      Buildings Phase I : 6 facilities

      Image
      Image

      4,000 acres owned, located in Millard County, Utah. Over 4,800 feet above sea level provides optimal cooling efficiency.

      Image
      Buildings Phase I: 6 facilities
      Image

      Power Density: Up to 800kW per rack

      Step Into a Pre-Engineered Data Campus and Accelerate Time-to-Compute

      • Shovel ready, entitled.
      • Architectures tuned for high-density racks and liquid cooling.

      • Use our design or bring your own – either way, the campus is ready.

      From Concept to Gigawatts:
      The Team That Delivers

      Meet the Joule team and discover what drives their mission to build one the world’s largest energy and advanced computing campuses.

      From Concept to Gigawatts: The Team That Delivers

      Meet the Joule team and discover what drives their mission to build one the world’s largest energy and advanced computing campuses.

      Image
      Image
      Image
      Image
      Image
      Image
      Image
      Image
      Image
      Image
      Image
      Image
      Image
      Image

      The Solution to Match
      AI's Appetite

      While others make you choose between speed and scale, the BetterGrid delivers both—operational capacity in months not years, with the flexibility to deploy our proven designs or build your own. Purpose-built infrastructure turns every watt into competitive advantage.