Joule BetterGrid: Power Independence at Hyperscale.
The Power Stack Built for AI Workloads
Forget waiting for utility interconnections. Our Caterpillar power generation equipment is purchased and scheduled for delivery. Combined Heat and Power (CHP) optimization turns waste heat into cooling capacity—the equivalent of having an extra 1.3GW of electricity without burning additional fuel.
Power Infrastructure
1.5 GW Caterpillar G3520K generation (firm order, delivery March 2026)
415-480V direct-to-rack architecture (no step-down transformers)
Grid-forming BESS: 60-minute full-load ride-through, black-start capable
N+2 redundancy on power and cooling lineup
CHP optimization yields 85% total system efficiency and 1.3 GW equivalent cooling power
Dual 36" Kern River transmission interconnects providing 380,000 Dth/day
Cooling Capabilities
Up to 800kW per rack design capability - Direct-to-chip liquid cooling ready
PUE Target: <1.26 through CHP and altitude advantages
Multiple cooling options - Air, liquid, immersion ready
90% water reduction via CHP. WUE < 0.02 - Advanced recovery and recycling systems
Your Express Lane to Every Major Market
True redundancy means more than two fiber entrances. Six independent fiber routes from separate providers ensure your data flows regardless of cuts, outages, or carrier issues.
Our Foundation is Built on Resilience
In Utah’s high-desert environment, seismic and climate risks are comparatively low and well-characterized. The campus pairs strong physical security with resilient, redundantly engineered infrastructure to provide a stable, long-horizon operating environment for your most critical workloads.
- Perimeter: Multi-layer fencing with intrusion detection
- Access: Biometric controls at all entry points
- Surveillance: 24/7 monitoring with AI-powered analytics
- Response: On-site security with <3-minute response
- Compliance: SOC 2, HIPAA, PCI-DSS capable design

The Power Partnership Behind the Joule BetterGrid
Our partnership with Caterpillar will deploy the most advanced Combined Heat and Power system in data center history. Waste heat becomes cooling capacity, turning inefficiency into advantage. Developed with Wheeler Power Systems, Utah’s authorized CAT® power dealer and integrator of over a dozen municipal and utility plans.
The Caterpillar Advantage:
1.5GW of generation capacity - equipment in production
Engineered for 99.999% reliability - Proven in mission-critical deployments
46% efficiency before CHP / >90% total with CHP. CHP delivers 1.3 GW of cooling equivalent capacity
Modular scaling - Add capacity as you grow
Materially reduces cooling-tower water through heat-driven absorption
CHP Innovation:
Waste heat capture from generators
Absorption chillers convert heat to cooling
Reduces total energy consumption by 35%
Eliminates cooling tower water waste
Infrastructure Intelligence: Your Technical Questions Answered
Ready to Deploy Without Grid Delays?
Stop waiting for utility approvals. Start building on infrastructure that's actually ready.